Category: Commercial projects | Location: Easto York, Toronto
Descriptions
Plastic or PVC pipes are not allowed to be used in the laboratory due to their acidity, and glass pipes are usually used. Glass pipe has a very high resistance to chemicals and corrosion. Due to the presence of chemicals and acidity, it can not be directed directly to municipal wastewater and must be treated beforehand, so the chemicals after passing through the glass pipes go to the chemical neutralization tanks due to the presence of Limestone inside the tanks, neutralization operation takes place. Due to the breakage of the glass tubes, they are inserted into the chamber or trench to prevent damage. Alternative PVDF pipes can also be used instead of glass pipes. Other requirements of the laboratory are due to the acidic and chemical environment of the eyewash and shower environment that can be used in the event of an accident.
This school laboratory project is at a school in Trenton Ontario where all the plumbing was done by the O Plus Plumbing group and took 1 month to complete. Due to chemical usage, all drainage and ventilation piping is glass and water piping is the capper.
The first wild wings restaurant opened in 1999 in Sunderland, Ontario, and quickly became one of the largest restaurants in Ontario due to its good food quality and great service.
**** Pickering wild wings: Pickering branch wild wings restaurant is one of the best wild wings branches in Ontario due to its convenient space and easy access. The project started in 2021 and was done in the same year. Rough-in and finishing plumbing of this project took 14 days and the material used is PVC, System Xfr, system 15 for the drain and copper, and aqua pex for the water service line. This restaurant plumbing fixtures are: 5 washers. (one handicap),3 hand sinks 1 three-compartment sink with 50 GPM grease interceptor, 1 cocktail sink,1 ice machine, 1 glass washer,1 mop sink and etc.
Category: Residential Projects | Location: North York
Descriptions
This project in North York includes 5 bathrooms. one 5 piece master bathroom including 1 wall-mounted toilet, 2 vanities, 1 huge standing shower with jets and a luxury freestanding tub one three-piece bathroom which has 1 toilet 1 vanity, and one regular bathtub. and two other bathrooms on the second floor. Also, the laundry room is located on the second floor. On the main floor, we have a luxury powder room and a nice kitchen which has one kitchen sink and pot filler with dishwasher and fridge. in the basement, we have one regular 3 piece bathroom for the baby room. the mechanical room is also located in the basement where the value client can control the hot and cold water piping through it.
O Plus Plumbing started working on a project in Mississauga in September 2020 and finished the same year which includes 4 bathrooms with black trim finishing. One 5 piece master bathroom including one wall-mounted toilet, two vanities, a standing shower with jets, and a freestanding tub one three-piece bathroom which has one toilet one vanity, and one regular bathtub. and the other bathroom on the second floor with one toilet, a vanity, and a standard standing shower.
On the main floor, we have a two-piece powder room and a kitchen with one kitchen sink and pot filler with dishwasher and fridge. in the basement, we have one regular three-piece bathroom for the guest room. the laundry room is on the basement floor.
They have a huge mechanical room in the basement and the client can control the hot and cold water from it due to separated piping at the water service manifold.
If you have any questions about O Plus Plumbing Inc. services or if you need a free consultation, complete the below form and submit it. Our support team will contact you as soon as possible.