ResidentialHeated Driveway & Snow Melting System Installations
Hydronic snow-melting systems for GTA driveways and walkways, tubing, manifolds and boiler connections installed before the new surface goes down.
- Client
- Residential clients
- Location
- Greater Toronto Area
- Project
- Heated driveways
5 photos
Heated driveway installation projects
These heated driveway installation projects show hydronic snow melting systems for driveways, walkways and steps across the GTA.
Each heated driveway installation includes the heating plant, installed to TSSA and Ontario Building Code requirements.
Project overview
These projects added hydronic snow-melting to residential driveways during driveway replacement. Warm glycol circulates through tubing embedded beneath the surface, melting snow and ice automatically.
The challenge
A snow-melt system has to be laid out precisely before concrete, asphalt or pavers go down, with even tube spacing, insulation where needed and a heat source sized for the area. There is no second chance once the surface is installed.
Our solution
We planned each loop layout for even heat across the driveway, installed and pressure-tested the PEX tubing, and connected the loops through manifolds to the boiler and controls so the system can run automatically.
Scope of work
- Heat-loss and loop layout
- PEX tubing installation and pressure testing
- Manifolds and zone connections
- Boiler and glycol system connection
- Controls and sensors setup
The result
Driveways and walkways that stay clear through Ontario winters, without shovelling, salt damage or ice hazards.
Project photos 5
See what else we have built
Have a plumbing or heating problem right now?
Call us, a real person answers, 24 hours a day. Or send a few details and photos and we will reply with next steps and a quote.
- Licensed & Insured
- 24/7 Emergency Service
- Free On-Site Quotes
- Workmanship Guarantee







